Detailed Introduction
As the project was carried out during normal operation of the airport, deliveries were carefully coordinated with the installation team to ensure car parks could be closed and opened according to the installation schedule.
The client is saving in the region of £100K per annum due to reduced energy consumption, maintenance visits and having better control over their installation.